Luminex IS Version 2.3 (IVD) Manuale Utente Pagina 93

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 116
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 92
xMAP Technology Luminex 2.3 Software
PN 89-00002-00-254 Rev. B 83
information for CAL 1, CAL2, CON1, and CON2 reagents are
correct.
5. Click OK to verify that the lot information is accurate.
Maintenance Procedures Table 8 shows a recommended schedule for maintenance operations.
Table 8. Maintenance Operations:
Recommended Use Schedule
Operation Recommended Use Schedule
Warmup Daily
After four hours of system inactivity
Prime Daily
To remove air from sheath fluid tubing
After performing these actions:
– refilling the sheath container
– removing and replacing sheath container
– changing the sheath fluid filter
– changing the syringe seal
Backflush Troubleshooting and preventative
maintenance purposes only:
– to remove obstructions from the cuvette
– if fluid does not flow through the waste
tubing during prime cycles or during
sample acquisition
– if fluid drips from the sample probe during
priming and forms puddles of fluid on the
plate
Alcohol Flush Daily
Before system calibration
After changing the sample probe
To remove air bubbles from the cuvette using
70% isopropanol or 70% ethanol
Sanitize To decontaminate sample lines and cuvette
after biohazard contact using 10% to 20%
household bleach
– daily if working with biohazards
– monthly if not working with biohazards
Wash As needed using distilled water
Four times after system calibration
Twice after sanitize
Vedere la pagina 92
1 2 ... 88 89 90 91 92 93 94 95 96 97 98 ... 115 116

Commenti su questo manuale

Nessun commento